SARS Warehouse
The Project objective:
The proposed works comprised the refurbishment of an existing warehousing facility with hard stand, truck loading and unloading areas.
Project Scope:
The brief scope of the project included repairs, upgrades and refurbishments as follows:
- Structural repair to relevant elements (floors, walls, spalling concrete at the underside of slabs, etc.)
- Construction of new surface beds and load bearing structural slabs.
- Construction of new raised dock levellers.
- Repairs to damaged roof sheeting.
- Full refurbishment to stormwater, sewer, electrical, mechanical & fire services.
- Refurbishment/completion of the site’s external works (all hard surfacing, etc).
- Refurbishment of all auxiliary structures on site (fuel storage, bin area, pump room).
- Installation of a new mass storage water tank for fire suppression.
- Installation of a new backup generator.
- Installation of all new fittings (sanware, electrical, mechanical, etc).
- Replacement of all finishes.
List of works in the project included:
- Principal Contractor
- Site Setup
- Structural Steel
Roof Covering - Air Conditioning and Ventilation (HVAC)
Fire Detection - Fire Sprinklers Installations
- Water & Fire Reticulation
Electrical Installation - Bulk Electrical Installation
- Reinforcing
- Waterproofing & Joint Sealing
- Plumbing
- Soil Poisoning
- Ceilings & Partitions
- Tiling
- Paintwork
- Floor Coverings
- Epoxy Paint
- Road Marking
- Glazing
- Metalwork